Installation
Install ECT sensor 1 (A) with a new O-ring (B).
Install the water bypass hose (C).
Remove all of the old liquid gasket from the water outlet mating
surfaces, the bolts ...
Throttle Body Disassembly/Reassembly
...
Change Lever Clearance Inspection (M/T)
Measure the clearance between the change lever (A) and the select lever
(B) with a feeler gauge (C). If the clearance is more than the service
limit, go to step 2.
...