PCV Valve Inspection
Remove the harness holder (A).
Check the PCV valve (A), the hoses (B), the pipe (C), and the connections
for leaks or restrictions.
At idle, make sure there is ...
Inboard Joint Side
Remove the boot bands. Be careful not to damage the boot.
If the boot band is welded type (A), cut the boot band.
If the boot band is a double loop type (B), lift up the ban ...
Mainshaft Reassembly (M/T)
Exploded View
Special Tools Required
Driver Handle, 40 mm I.D. 07746-0030100
Bearing Driver Attachment, 30 mm I.D. 07746-0030300
NOTE: Refer to the Exploded Viewas neededduring this proc ...